Qualified supervisors on site, qualified stone fixers on the stone, and every room checked before it's handed over.

Marble vanity with a basin and a bronze-framed mirror against marble walls at the Old War Office

Qualifications and cover

What we hold

  • Supervision

    NOCN Level 3 NVQ Diploma in Occupational Work Supervision

    Held by our site supervisors, who run the team and the work area day to day.

  • Stone fixing

    ProQual Level 2 NVQ Diploma in Stonemasonry (Internal Stone Fixing)

    Held by our stone fixers, for marble and natural stone floors, walls, stairs and details.

  • Systems

    Schlüter training

    Our team is trained on Schlüter systems for waterproofing, profiles and trims.

  • Insurance

    £2,000,000 Public Liability

    Cover for the work our teams carry out on site.

  • Warranty

    12 months on materials and workmanship

    Given on every package we hand over.

How a package runs

From the drawings to handover

  1. Drawings, specification and quantities

    You send the drawings, the tile and stone schedule and the quantities. We price the labour for the whole tiling and stone package, or for one part of it.

  2. Setting out before the first tile

    Floors and walls are checked for level, the setting out is agreed with the site team, and pattern, joint width and cuts are fixed before work starts.

  3. Supervised on site

    Our supervisors hold an NVQ Level 3 in Occupational Work Supervision and work to the main contractor's RAMS, inductions and site rules.

  4. Checked room by room

    Each area is checked against the drawings and the specification before it is signed off, so snagging stays small at handover.

  5. Handover and 12 months

    We hand over clean, finished rooms and stand behind our materials and workmanship for 12 months.

Quality, stage by stage

What gets checked before it's covered

A tiled floor is only as good as the screed and the setting out under it, so we check those while they can still be put right.

Stage checks
StageWhat we check
SubstrateLevel, flatness and dryness of floors and walls checked before anything is fixed to them.
Setting outJoint lines, pattern start points and cuts agreed with the site team before the first tile or stone goes down.
WaterproofingMembranes, corners and drain connections in wet areas checked before they are tiled over.
Finished roomJoints, levels, lippage and silicone checked against the specification before the room is signed off.

Send the drawings. We'll price the package.

Drawings, the tile and stone schedule, the quantities and the programme: whatever you have. We price the labour for the whole tiling and stone package, or for one part of it.